KOC Integrated Security Systems for all KOC Facilities Civil and Security Systems

Project: KOC Integrated Security Systems for all KOC Facilities Civil and Security Systems.
Role: Sub-contractor
Client: KOC
Scope of work: Integrated security systems for all KOC facilities at Ahmadi associated with SDS Samsung. Including buildings, external work as roads, water supply, car parking, infrastructure and landscaping
Status: Ongoing

Supply, and Installation of Post tensioning works for the superstructure

Project: Supply, and Installation of Post tensioning works for the superstructure.
Role: Sub-Contractor to Arab Contractors (Osman Ahmad Osman)
Client: Ministry of Public Works
Scope of work: Subcontractor for the post-tensioning work for the superstructure of all bridges in Jahra Road.
Status: Ongoing

Design, Supply, and Installation of mould’s & gantries for segments erection

Project: Design, Supply, and Installation of mould's & gantries for segments erection.
Role: Sub-Contractor for Arab Contractor (Osman Ahmad Osman)
Client: MPW
Scope of work: Subcontractor for pre-cast balanced cantilever bridge for Jahra Road Project.
Status: ongoing

Post Tension Works for Shuwaikh Complex

Project: Post Tension Works for Shuwaikh Complex.
Role: Subcontractor
Client: Elmaskar Contracting Company
Scope of work: Stressing the Mall slabs after casting to improve the characteristics of the concrete, and reduce the tonnage of steel used.
Completion: 2009

First Ring Road – Post Tension Works

Project: First Ring Road – Post Tension Works
Role: Sub-Contractor for Aktor SA Company
Client: Ministry of Public Works
Scope of work: Design, supply and apply all of the Post Tension works for 3 flyover bridges and 6 shallow bridges.
Completion: 2012

Design, Supply, Installation and Maintenance of Space frame Works

Project: Design, Supply, Installation and Maintenance of Space frame Works.
Role: Subcontractor
Client: Ministry of Education
Completion: 2010

Study, Design, Improvement, Construction, Operation & Maintenance of Irrigation at Al-Abdali Farms

Project: Study, Design, Improvement, Construction, Operation & Maintenance of Irrigation at Al-Abdali Farms.
Role: Main Contractor
Client: Ministry of Public Works
Status: ongoing

Replacing Fresh Water Pipeline 40 Dia & Ductile Iron Pipeline 1000mm Dia with a 1200mm Dia Ductile Iron Pipeline from Doha Pumping Station to Mutlaa Reservoir area

Project: Replacing Fresh Water Pipeline 40 Dia & Ductile Iron Pipeline 1000mm Dia with a 1200mm Dia Ductile Iron Pipeline from Doha Pumping Station to Mutlaa Reservoir area.
Role: Main Contractor
Client: Ministry of Electricity & Water
Status: ongoing

Installation and Relocation of Pipelines and other services for Jamal Abdul Nasser Street

Project: Installation and Relocation of Pipelines and other services for Jamal Abdul Nasser Street
Role: Subcontractor
Client: Ministry of Public Works
Status: ongoing

Installation, Construction & Maintenance of1200mm diameter ductile iron distribution pipeline from West Jleeb Alshioukh Water Towers to 6th Ring Road with Pipeline 600mm Dia

Project: Installation, Construction & Maintenance of1200mm diameter ductile iron distribution pipeline from West Jleeb Alshioukh Water Towers to 6th Ring Road with Pipeline 600mm Dia.
Role: Main Contractor
Client: Ministry of Public Works
Scope of work: Installation of ductile pipe 1200mm diameter with 10Km long connection with West Jleeb towers including trenchless pipe jacking under crossing roads
Completion: 2008

Design, Supply, Installation and Maintenance of Tensile Fabric for New Ministry of Interior Headquarters

Project: Design, Supply, Installation and Maintenance of Tensile Fabric for New Ministry of Interior Headquarters.
Role: Subcontractor
Client: Ministry of Interior